◆ Everything below exists because a body shop asked for it

Six problems your shop has today. Six things Helios does about them.

Not a feature list — a walk through the day of a collision shop and where the hours leak out.

Managers stop walking the floor

Stop chasing technicians for status

A customer calls, and finding the answer takes a walk to the back, a conversation, and a look at a whiteboard that was last accurate this morning. Helios gives every vehicle a live position — stage, bay, technician, hours — visible from any device.

Every vehicle, every stage — one screenLive
Production Board Total Value in Production: $81 075 | Total Hours in Production: 340h New Job Filter
Check-in1
Total Value$0
Total Hours0h
#DROP OFFJun 1/
Darren Gonzalez2024 Ford Mustang
0h / 0h
64
Repair plan2
Total Value$14 100
Total Hours50h
#24279Jun 29/ -
Rob Schleicher2022 Honda CR-V Plymouth Rock
11.8h / 7.1h$4,162.89
02
#24281Jun 29/ -
Jessica Leister-Conte2018 Jeep Wrangler AAA
4.3h / 4.4h$2,298.99
07
Waiting approval1
Total Value$9,499.26
Total Hours63.3h
#24255Jun 2 / -
Deveraux2026 Ford Transit Holman
51.4h / 11.9h$9,499.26
114
Waiting parts1
Total Value$0
Total Hours0h
#24203Apr 27 / -
Mike Dowd2000 Ford Crown Vic
0h / 0h
02
Body2
Total Value$43,192.63
Total Hours264.5h
#24232May 26 / -
Autozone Sicklerville2026 Chevrolet Colorado Wheels
57.9h / 14h$8,851.91
90
#24242May 26 / -
Frederick/Marilyn Lupus2020 Honda Pilot Plymouth Rock
60.6h / 23.3h$14,262.15
04
Paint2
Total Value$28,501.17
Total Hours153.3h
#24258Jun 8 / -
Kevin Witkoski2025 Honda Civic Plymouth Rock
23.3h / 15.1h$6,742.19
04
#24256Jun 1 / -
Dolores Bathurst2022 Honda Odyssey Geico
25.3 / 10.9h$5,116.83
14
Bays stay full 90% of the time

Plan your week — and the five after it

The planning board shows six weeks of capacity at once. Drag a job onto a week and the hour totals recalculate before you commit to a delivery date.

6-week production view

See booked hours vs. capacity across a rolling six weeks — the horizon most shops never had.

Drag-and-drop scheduling

Move a job to a new week and totals update live. No re-keying, no second spreadsheet.

Instant vehicle check-in

A car arrives, it’s on the board in seconds — with hours and production value attached.

You know your real load without a report

The production board that runs your entire shop

Left-to-right workflow that matches how work actually moves. Custom status colors you define, so a glance tells you what’s on hold. Live hour and production-value totals sit on every column.

Custom status colors

Define the statuses your shop actually uses — parts hold, waiting on approval, sublet out — and color them so problems surface without anyone reporting them.

Live hour & value totals

Booked hours and production value per column and shop-wide. The number at the bottom of the board is always current.

No more hunting through camera rolls

Every photo and document stays with the job

Techs upload from their phone straight to the RO. Estimates, supplements and reports live on the same job card. When an insurer wants the file, you download every photo as a ZIP.

Mobile photo upload

From the tech’s phone to the job card in one tap. No email, no AirDrop, no lost images.

Download all as ZIP

One click hands the insurer or customer the complete photo set for a repair order.

Docs in one place

PDFs, estimates, supplements and reports centralized on the job — not in someone’s inbox.

Zero duplicate data entry

Everyone sees the same shop — instantly

Phones, tablets, office desktops and the shop-floor TV all show the same board with no manual refresh. Helios syncs with CCC ONE, so new jobs and status changes flow in automatically.

Go live in under 24 hours. Cloud-based, nothing to install, free onboarding, and we migrate your current whiteboard or spreadsheet for you.

An honest, checkable comparison

Helios vs. Tekmetric vs. AutoLeap

Both are solid tools built for mechanical service writing. If your problem is that you can’t see your floor, that’s the gap Helios was built to close.

CapabilityHelios ProTekmetricAutoLeap
Live visual production board✓ Core product——
Six-week capacity planning✓—Limited
Purpose-built for collision✓Mechanical-firstMechanical-first
CCC ONE estimate sync✓ IncludedAdd-onAdd-on
Live hour + production-value totals✓Reports onlyReports only
Photos & docs attached to RO✓✓✓
Mechanical labor guides—✓✓
Typical time to go liveUnder 24 hours2–6 weeks2–4 weeks
Starting price (10 users)$199/mo$399+/mo$349+/mo